Pipeline Construction & Integrity

From 100 meters to 20 kilometers, Swartzy Group has you covered. Building pipelines in size from 2″-12″. From smart pigging to integrity digs, give us a call for your integrity and construction needs.

New line or aging asset, one company.

Full-scope pipeline construction plus the maintenance and integrity work that keeps existing lines compliant. Whether you’re putting steel in the ground or keeping an old line in service, it’s the same crew and the same standard.

On the construction side, we handle the build start to finish: trenching, stringing, welding, tie-ins, testing, and backfill. CWB-certified welders and ABSA-qualified pressure work mean the line is built to carry what it’s rated for.

On the maintenance side, integrity failures are one of the main reasons operators call. Integrity digs expose and assess the line where it matters, and repairs happen before a small problem becomes a spill.

Smart pigging runs in-line inspection tools through the pipe to catch wall loss, cracking, and anomalies before they turn into failures, giving you the data to plan the next dig instead of reacting to the next leak.

Everything a pipeline needs.

01

Trenching, stringing, welding, tie-ins, testing, and backfill.

02

Excavation and assessment to keep aging lines compliant.

03

In-line inspection that catches wall loss and cracking early.

04

Coded repair and connection work on new and existing lines.

05

Extensive quality control package provided.

From ground to gauge,

01

Plan

Site walk to lock the route and the tie-in points.

02

Build or dig

Construct new line or expose and assess the existing one.

03

Test & inspect

Pressure test, smart pig, and verify against spec.

04

Document

Hand over as-builts and inspection records before we call it done.

Related Services

Maintenace Crews

Spill Cleanup & Reclamation

Welding

Have a line to build or maintain?

Tell us the scope — we’ll tell you what it takes.